Loading resourcesโฆ
Loading resourcesโฆ
Metal โข columbite_tantalite โข 1 deposit(s)
Tantalite: ~25 tonnes. Columbite: ~3,000 tonnes. Critical for electronics. Nigeria 7th globally in tantalite. Production ~1,300 tonnes/year. $400M processing plant planned (Nasarawa).
Plateau, Nasarawa, Kogi, Gombe, Kaduna, FCT
Basis: in-place (applied)
= 25.0%
Gross Value
$94.50MmodeledState Value
$23.63Mmodeled