Loading resourcesโฆ
Loading resourcesโฆ
Metal โข iron_ore โข 2 deposit(s)
FAILED AMBITION: Ajaokuta Steel Complex ($8B invested, never operational, 42+ years). Itakpe mine operates at fraction of capacity. "3 billion tonnes" claim includes low-grade deposits. Imports still dominate Nigerian steel market. Political interference and corruption allegations surround sector.
Kogi
Basis: in-place (applied)
= 25.0%
Gross Value
$12.84BmodeledState Value
$3.21BmodeledBasis: in-place (applied)
= 25.0%
Gross Value
$10.20BmodeledState Value
$2.55BmodeledBasis: in-place (applied)
= 25.0%
Gross Value
$15.60BmodeledState Value
$3.90BmodeledKogi
Basis: in-place (applied)
= 25.0%
Gross Value
$2.13BmodeledState Value
$531.86MmodeledBasis: in-place (applied)
= 25.0%
Gross Value
$1.39BmodeledState Value
$347.08Mmodeled